Messy files in · resolved week out

Your week of technician routes, solved in 30 seconds.

DispatchPing is the fast planning cockpit for field-maintenance teams: upload the jobs and roster you already have, validate the constraints, and hand back an accepted, SLA-safe schedule.

7-day free trial · no rip-and-replace

<0s
solve time per weekly plan
CSV/XLSX
messy files in
0 steps
from chaos to plan
Before
MON_SCHEDULE_v7_FINAL.xlsx
Tech
Mon AM
Mon PM
Alvarez
Elev #4
?
Brandt
Boiler
Fire #2
Costa
Elev #9
Demir
Fire #7
?
Eriksen
HVAC
Boiler

4 past SLA · 3 unassigned · 2 backtracks

After · optimized in 28s
week_optimized · all assigned
Tech
Mon AM
Mon PM
Alvarez
Elev #4
Chiller
Brandt
Boiler
Fire #2
Costa
Lift #3
Elev #9
Demir
Fire #7
Pump #5
Eriksen
HVAC
Boiler

All SLAs green · −32% drive time

The Monday ritual

A whiteboard can't solve a routing problem.

Every week an operations manager hand-builds the field service schedule in Excel — juggling technician certifications, legal inspection deadlines, drive time and shifts. The result is good enough, never optimal.

0k+
per missed inspection

Legally-due inspections cut it close

Mandated inspection windows get scheduled near their deadline — and a slip is a regulatory fine that's invisible on a spreadsheet until it's too late.

On a spreadsheet

Deadlines tracked by hand across tabs
No warning until a job is already overdue

With DispatchPing

Every window enforced as a hard constraint
Amber / red SLA flag before you commit
0%
drive time wasted

Technicians backtrack across the city

A tech drives 40 minutes between two jobs five minutes apart. Nearest-available assignment burns fuel and caps how many jobs get done per day.

On a spreadsheet

Nearest-available guesses, never optimal
Crews crisscross the whole service area

With DispatchPing

Globally optimal routing across all jobs
−32% total drive distance, more jobs/day
0 hr+
to replan by hand

One emergency wrecks the whole plan

An urgent job lands mid-week and the manual plan falls apart. Re-planning by hand takes another hour you don't have.

On a spreadsheet

The whole week reshuffles manually
Knock-on SLA risks are easy to miss

With DispatchPing

One-click re-optimize in seconds
Clear before / after diff for the team
How it works

Upload. Map. Validate. Optimize. Review. Export.

A guarded planning run from raw customer files to an accepted technician schedule. No migration, no new field app, no tab maze.

01

Upload jobs and roster

Bring the weekly job file and either upload a roster or choose a saved crew. CSV and XLSX files are parsed into preview rows before anything is committed.

jobs.csvroster
32
jobs this week
8
technicians

Captured per job

Location & asset type
Required certification
Time window & duration
02

Map customer columns

The mapping assistant proposes how messy customer columns line up with jobs, technicians, skills, shifts, windows, and priorities. The dispatcher confirms the mapping before validation.

AI proposalhuman confirm
Customer columnsite_addr
DispatchPing fieldaddress
Confidencereviewed
03

Validate the run

Hard blockers, warnings, exclusions, missing skills, odd durations, and suspicious mappings are surfaced before the solver runs, including a pre-solve AI critique.

warningsAI critique
Missing skills surfaced
Impossible windows blocked
Outliers reviewed before solve
04

Generate the plan

DispatchPing builds the distance matrix, sends the solver-ready payload to cuOpt, and returns a normalized schedule with routes, exceptions, and metrics.

Solved in 28scuOpt
Matrixdrive time
Objectivebalanced week
Resultschedule version
05

Review exceptions

Inspect scheduled, unscheduled, excluded, and at-risk work before accepting the plan. The Run Center keeps the dispatcher focused on the next decision.

118
scheduled
4
exceptions

Review lenses

SummaryRoutesexceptions
06

Export the handoff

Generate the handoff records your team needs: route summaries, technician route workbooks, calendar CSV, and exception reports for follow-up.

Accepted plan
WorkbookCalendar CSVException report
The planning cockpit

The weekly planning step your FSM does not solve globally.

Already have Jobber, ServiceTitan, Housecall Pro, Excel, or your own field-service system? DispatchPing handles the constraint-heavy planning run beside it.

123456
Run Center

A guided planning workspace

One operational run moves through upload, mapping, validation, optimization, review, and export with guarded next steps.

site_addraddress98 %
Messy files

CSV/XLSX intake and AI mapping

Upload raw customer files, preview the parsed rows, and confirm AI-proposed mappings before they become canonical planning data.

Missing skills surfaced
Impossible windows blocked
Outliers reviewed before solve
Pre-solve

Validation plus AI critique

DispatchPing checks solver readiness before a costly optimization run starts.

−32 %28 s
Optimization

Real solver-backed schedules

The same pipeline used by the workflow harness powers uploaded runs in the Run Center.

SummaryRoutesexceptions
118
scheduled
4
exceptions
Review

Routes, metrics, and exceptions

Review the normalized schedule before accepting it, with live metrics for scheduled, unscheduled, excluded, routes, drive, and service time.

Workbook
Calendar CSV
Exception report
0/3
Handoff

Export artifacts for follow-up

Generate practical handoff files and records from the accepted plan without pretending DispatchPing is your whole field execution suite.

The numbers

Optimal isn't a buzzword. It's measurable.

Every week on the spreadsheet costs you hours, miles and risk. Here's what that adds up to.

3–0 hrs
saved every Monday

The weekly scheduling session collapses to a single click.

That's 150+ hours a year — nearly a full working month — spent wrestling a spreadsheet instead of running the business.

0%
less drive time

Globally optimal routing instead of nearest-available guesses.

Every wasted mile is fuel burned, overtime paid, and one more job you couldn't fit into the day.

0%+
SLA compliance

Legally-due inspections scheduled safely inside their windows.

A single missed statutory inspection can mean a five-figure fine — and the contract that goes with it.

Built for the field

If you service fixed assets at many sites, this is for you.

DispatchPing fits any contractor whose techs need the right certification, in the right place, inside a legal window.

Certification-aware

HVAC

Plan seasonal maintenance and emergency callouts across every site, with the right certified tech on each job.

01 / 06
Statutory windows

Elevator maintenance

Keep statutory lift inspections inside their legal windows and dispatch engineers in the optimal order.

02 / 06
Deadline-safe

Fire safety

Never miss a mandated inspection — alarms, extinguishers, sprinklers — with deadline-safe scheduling.

03 / 06
Audit-ready

Medical equipment

Service and calibrate critical devices on time, with an audit-ready record for every visit.

04 / 06
Annual compliance

Boiler servicing

Schedule annual services and safety checks so no boiler slips past its compliance due date.

05 / 06
Precision routing

Asset calibration

Route precision-calibration jobs by certification and location, minimizing downtime per site.

06 / 06
Pricing

Pricing for the planning cockpit, not a delivery suite.

Start small with a pilot crew, then scale the same weekly planning workflow across larger maintenance teams.

Pilot

€79/month

For tiny teams testing the weekly planning workflow.

  • Up to 3 active technicians
  • 1 dispatcher seat
  • 20 generated plans/month
  • 50 jobs per run
  • Core Run Center workflow
Start free trial
Most popular

Starter

€149/month

For small field teams replacing weekly Excel scheduling.

  • Up to 10 active technicians
  • 2 dispatcher seats
  • 75 generated plans/month
  • 150 jobs per run
  • Saved mappings and 6-month history
Start free trial

Growth

€349/month

For serious weekly dispatch operations.

  • Up to 40 active technicians
  • 5 dispatcher seats
  • 250 generated plans/month
  • 500 jobs per run
  • Templates, versioning, export profiles
Start free trial

Scale

€699/month

For regional maintenance teams coordinating capacity.

  • Up to 100 active technicians
  • 15 dispatcher seats
  • 750 generated plans/month
  • 1,500 jobs per run
  • Everything in Growth
Start free trial

7-day free trial on every plan. Cancel anytime before it ends.

Compare operational limits

Every paid tier includes the full Run Center loop. Plans differ by scale, memory, collaboration, automation, and support.

Feature
Pilot
Starter
Growth
Scale
Active technicians
3
10
40
100
Dispatcher seats
1
2
5
15
Generated plans/month
20
75
250
750
Jobs per run
50
150
500
1,500
History
30 days
6 months
24 months
5 years
Audit trail
No
Basic
Yes
Advanced
Support
Email
Priority email
Priority
Priority + onboarding

Scroll horizontally to compare all plans.

Questions

Everything a skeptical ops manager asks.

Still unsure? The 7-day trial answers the rest.

Run one messy planning file through DispatchPing.

Keep your FSM. Bring the weekly jobs and crew data that still end up in spreadsheets, then see the plan, exceptions, and handoff records from one cockpit.